PROINSO, a global leader and award-winning services for solar energy projects,
is now a Global Authorized Distributor of Tigo Energy TYGO (NASDAQ)

About Tigo

Best Rapid Shutdown MLPE product in the world.
Proven track record for over 16 years (since 2007).
Currently listed on Nasdaq.
Patent protected.
Over 110 patents issued or pending.
Over 100 Million Units shipped in last 4 years.

Tigo – Fully compliant with Thai Regulations

Tigo is fully compliant with Thai RSD regulation (reduce the voltage inside the array to 80 v within 30 seconds from Rapid Shutdown Initiation).

All products are UL1741 Certified.

Why choose Tigo x

Proven, reliable rapid shutdown systems

Tigo rapid shutdown devices have been deployed on rooftops all over the world to meet electrical code safety requirements that protect firefighters and first responders from electrical shock.

Compatible with most inverters

Works with majority of major modules and inverter brands. Not locked in for life, can always choose the best available inverter at the time. No effect on inverter warranty.

Backward compatibility

Newer models of TIGO will always be compatible with the current/older models; no need to keep stock of old items.

Retrofitting with ease

With wireless communication models, there is no complicated wiring requirement.

No heat generation, no heat sink

Less ventilation space required on rooftop. Lower risk of damaging the panels.

No Crosstalk issue

With Tigo’s wireless communication or Pure Signal Technology, there is no risk of cross talk.

Easy Installation

No ground wire or bolts required.

Fleet Management

Tigo Energy Intelligence (for Optimizers/Monitoring) is the most powerful solar monitoring and commissioning solution.

The Tigo family of Flex MLPE

TS4-A-O

FUNCTIONS

 

Check mark iconOptimization
Check mark iconMonitoring
Check mark iconRapid Shutdown

 

REQUIRED
CCA + TAP

 

DESCRIPTION
Increase energy production with shaded & mismatched modules up to 700W

TS4-A-S

FUNCTIONS

 

Check mark iconMonitoring
Check mark iconRapid Shutdown

 

REQUIRED
CCA + TAP

 

DESCRIPTION
Enables monitoring and rapid shutdown for modules up to 700W

TS4-A-F

FUNCTIONS

 

Check mark iconRapid Shutdown

 

REQUIRED
RSS Transmitter

 

DESCRIPTION
Dedicated rapid shutdown device for 1 solar module up to 700W

TS4-A-2F

FUNCTIONS

 

Check mark iconRapid Shutdown

 

REQUIRED
RSS Transmitter

 

DESCRIPTION
Dedicated rapid shutdown device for 2 solar modules

Training and support: From design to commissioning

Our excellent support teams are positioned throughout the world and are available to answer your questions and provide your team with the training necessary to succeed.

FAQ

Are all Tigo products compliant with the Thai regulations?

Yes, all Tigo products comply with the requirement to reduce the voltage inside the array to 80 v within 30 seconds from Rapid Shutdown Initiation.

Do all the products have a rapid shutdown function?

Yes. Our Optimizers/Monitoring products also have the rapid shutdown function and are compliant with the Thai regulations.

Does my inverter need to be placed on the roof when used with Tigo products to comply with the Thai regulations?

No. Tigo complies with NEC690.12(B)(2)(2) and is UL1741 certified. This means the inverter used together with Tigo does not need to be inside the array (some systems that are UL3741 certified require the inverter to be placed within 1 foot of the array).

Do Tigo products use PLC? I’m concerned about cross-talk issues?

  • F and -2F (Rapid Shutdown) use PLC, but Tigo’s patented Pure Signal Technology negates cross-talk issues.
  • O and -S are wireless, so there are no cross-talk issues whatsoever.

Can I use any of Tigo products with any inverter brand of my choice?

Yes, all of Tigo’s products are compatible with the majority of major inverter brands using MPPT.

My inverters’ life span is 10 years, and Tigo products warranty is 25 years; if I want to change my inverter brand after 10 years, do I need to change the Tigo Optimizer/RSD to match the new inverter?

Tigo’s products are compatible with the majority of major inverter brands using MPPT, so it is most likely compatible with your new inverter.

Does it require additional cables? I’m concerned about the hidden costs.

No additional cabling required. Power source for the MLPE device is generated by the solar panels.

I am a developer with many projects. How can I manage all those projects?

TIgo offers the Tigo Fleet Management application, which makes monitoring multiple projects easy. Tigo offers training on the use of this system, please contact us for more details.

I have a solar farm, do you have any products that can help me monitor the electricity generation?

We have the –M series that can help monitory the energy generation on a modular level (no RSD function)

Tigo workshop registration
PROINSO & Tigo Energy Technical Roadshow

Friday, 3rd November 2023

09:30 AM –  17:30 PM

Novotel Bangkok Ploenchit Sukhumvit, Thailand